Wind Turbine Generator Handling with Heavy-Duty Forklift at Vestas Facility, ConstanțaFORKLIFTSCONSTANȚAMAR 2026Wind Turbine Generator Handling with Heavy-Duty Forklift at Vestas Facility, ConstanțaUnloading and handling of Winergy wind turbine generators (~19t) from flatbed trailers at a wind energy operator's facility in Constanța, using a Svetruck 28120-46 forklift.Equipment:Svetruck 28120-46 28 Tones
High-Precision Port Handling: 7-Ton Operations at Port Constanța (Dana 34)FORKLIFTSPORT DANA 34, CONSTANȚAJAN 2026High-Precision Port Handling: 7-Ton Operations at Port Constanța (Dana 34)Kran recently completed a complex logistics operation at Port Constanța’s Dana 34. By leveraging high-capacity handling equipment, we delivered fast, safeEquipment:Forklift
Industrial Equipment Unloading & Handling – Ovidiu, Constanța CountyMOBILE CRANESOVIDIU, JUDEȚUL CONSTANȚAJAN 2026Industrial Equipment Unloading & Handling – Ovidiu, Constanța CountyKran provided complete heavy-handling and logistics support for an industrial unloading operation in Ovidiu, Constanța County. The scope of work includedEquipment:Scania R164G 8x4 FASSI F900XP 20 tonnes +1
Heavy Industrial Load Handling with 28 t Forklift – Mihail Kogălniceanu, ConstanțaFORKLIFTSMIHAIL KOGĂLNICEANU, CONSTANȚADEC 2025Heavy Industrial Load Handling with 28 t Forklift – Mihail Kogălniceanu, ConstanțaKran provided heavy-duty material handling support using a Svetruck 28120-46 industrial forklift for the safe transport and positioning of a largeEquipment:Svetruck 28120-46 28 Tones
Svetruck 28-120 Forklift – Transport & Site Support, Mihail KogălniceanuFORKLIFTSCONSTANȚA & DOBROGEASEPT 2025Svetruck 28-120 Forklift – Transport & Site Support, Mihail KogălniceanuKRAN provided end-to-end transport and deployment of a 28-t class Svetruck forklift. Scope: route planning, low-bed loading, chained securement, siteEquipment:Svetruck 28120-46 28 Tones
Unloading and Moving a CNC Machine in ConstanțaFORKLIFTSCONSTANTAJAN 2025Unloading and Moving a CNC Machine in ConstanțaIntroduction Using one of our forklifts, the Still RX60-40 Explosion Proof 4 tons the task of this project was to unload CNC (Computer Numerical Control)Equipment:Still RX60-40 Explosion Proof 4t
Unloading and Installing 3 Tons Lift in ConstanțaMOBILE CRANESCONSTANȚA , STRADA CELULOZEISEPT 2024Unloading and Installing 3 Tons Lift in ConstanțaIntroduction Last week, Kran participated in the project on Celulozei Street in Constanța. It was necessary to unload a piece of equipment andEquipment:Scania R164G 8x4 FASSI F900XP 20 tonnes +1