KranKran
Home
Services
EquipmentProjectsContact

Kran

Str. Emil Bota nr. 16A
Agigea, Constanța 907015
Romania

Services

  • Cranes
  • Forklifts
  • Aerial Platforms

Links

  • Equipment
  • Projects
  • Contact

Contact

  • +40 757 016 913Phone
  • contact@kran.roEmail
  • WhatsApp
Str. Emil Bota nr. 16A, Agigea, Constanța 907015
PrivacyPrivacy policyCookiesCookie policyTermsTerms and conditions

© 2026 Kran. All rights reserved.

We use cookies to measure site performance and advertising campaigns. Cookie policy

/
Crane Maintenance Operations at Port Constanta

Crane Maintenance Operations at Port Constanta

Portfolio/Mobile Cranes
LOCATIONPort Constanța, Terminalul CSCT
DURATION1-3 days
EQUIPMENTTerex Demag AC100-5 100 tonnes
LOCATIONPort Constanța, Terminalul CSCT
DURATION1-3 days
EQUIPMENTTerex Demag AC100-5 100 tonnes

Project details

In a recent operation at the Constanta South Container Terminal, our team was tasked with conducting essential maintenance on a port crane. This specific job required high precision due to the intricate nature of the crane components involved.

Technical Details of the Operation:

  • Type of Job: Crane Maintenance
  • Crane Type Used: Terex Demag AC100 / Telescopic Crane
  • Location: Port Constanta, CSCT Terminal
  • Duration: 2 days, from February 7th to February 8th, 2024
  • Task Details: Replacement and installation of a 15-meter crane segment and a hydraulic cylinder weighing between 5-6 tons.

Operational Process:

The operation commenced early in the morning with the arrival of our telescopic crane at the site. The initial phase involved the careful disassembly of the existing 100-ton crane segment. After safely lowering the disassembled parts, our team facilitated the installation of the new crane segment. The process required meticulous coordination to ensure that the 15-meter section was securely and precisely positioned.

Following this, a 5-6 ton hydraulic cylinder was mounted to enhance the operational capability of the crane. The entire task was performed under strict safety protocols to ensure a seamless and risk-free operation.

Client Coordination:

The project was efficiently executed in collaboration with the client’s technical team, ensuring that all specifications and requirements were meticulously met. Operational contacts for the project were made available for seamless communication and coordination throughout the duration of the task.

Project Completion:

The crane maintenance project was successfully completed within the stipulated two-day period. Our team’s expertise in handling heavy machinery with precision significantly contributed to the swift and effective completion of the project.

Acknowledgments:

We extend our gratitude to our client for allowing us the opportunity to assist in the maintenance of their port crane. The cooperation and trust between our teams were instrumental in the safe and efficient completion of this project.

Have a project with special requirements?

We help you choose the right equipment and approach.

4.9
101 Google reviews
Request similar project

Equipment Used

Terex Demag AC100-5 100 tonnes

Terex Demag AC100-5 100 tonnes