LOCATIONCostinești, Constanța
DURATIONmore than a month
EQUIPMENTTerex Demag AC100-5 100 tonnes
EQUIPMENTFaun ATF 500XL 45-3 45 tonnes
EQUIPMENTScania R164G 8x4 FASSI F900XP 20 tonnes
Project details
We worked at the Nibiru arena in Costinești for a whole season, assembling the stages and the installations around them. The orders came on separate contracts and from separate organisers, but the site was the same throughout.
We lifted towers and transformer substations, moved container frames and materials, and fitted signage, floodlights and suspended pieces above the stage. Some of the work was done at night, so the ground in front of the stage stayed clear during the day.
The truck-mounted crane, the 45-tonne and 100-tonne mobile cranes, the forklift, the telehandler and the boom lift each came in as the load required.
Scheduled duration: more than a month.