At a cement terminal in the Port of Constanța we worked on an old harbour crane standing on the quay. We came back to the same site several times, from spring into summer.
The 100-tonne mobile crane and then the 90-tonne one went in, each set up on the strip of platform between the silos and the water, with the boom raised to the top of the structure.
The orders came on separate contracts, a few weeks apart, for the same client.
Estimated duration of the job: more than a month.