Tuzla is where the pipeline of the Neptun Deep project, developed by OMV Petrom and Romgaz, comes ashore. It will bring natural gas from the Black Sea. The pipeline is about 160 km long and 76 cm in diameter, starts at the offshore platform and passes under the shore through a microtunnel. The gas metering station and the control centre are being built on the same site, and from there the gas will enter the national transmission system.
We worked on this site from August to November, for one of the teams there. We did the lifts with the 100-tonne Terex Demag AC100-5 mobile crane, with an operator, riggers and a lifting supervisor, alongside a telehandler. We lifted pipe sections and delivered site containers, portable toilets and a security cabin.
We were called in stages, a few days or a few weeks apart. Between stages that were close together, the crane and the telehandler stayed on site.
Estimated duration of the job: more than a month.
We worked on this site from August to November, for one of the teams there. We did the lifts with the 100-tonne Terex Demag AC100-5 mobile crane, with an operator, riggers and a lifting supervisor, alongside a telehandler. We lifted pipe sections and delivered site containers, portable toilets and a security cabin.
We were called in stages, a few days or a few weeks apart. Between stages that were close together, the crane and the telehandler stayed on site.
Estimated duration of the job: more than a month.