Kran machines on the Sala Polivalentă construction site in Constanța

LOCATIONConstanța
DURATIONmore than a month
EQUIPMENTJCB 530-120
EQUIPMENTFaun ATF 500XL 45-3 45 tonnes

Project details

Constanța's new multi-purpose sports hall, the Sala Polivalentă, with 5,000 seats, is being built on Aurel Vlaicu Boulevard. Work resumed in March 2026 after a pause of two and a half years. From April to November we worked here almost continuously, for the main contractor and for several teams fitting the façade, the roof and the interiors.

We unloaded trucks carrying sandwich panels, metal sheeting, AAC blocks, mineral wool and plaster, lifted materials to the upper levels, loaded formwork and moved site office containers. The mobile crane lifted the roof canopy panels and parts for the façade.

Machines: the 45-tonne Faun ATF 500XL mobile crane, the JCB 530-120 telehandler, a 6-tonne rotating telehandler, truck-mounted cranes, forklifts, road rollers, an electric scissor lift and a flatbed truck.

Estimated duration of the job: more than a month.