The job took place at City Park Mall in Constanța, installing a dinosaur exhibition. The crane lifted the figures and set them down on the lawn in front of the building.
We used a 45-tonne mobile crane, with operator, fuel and transport included. It was set up on the paved apron beside the building, and the telescopic boom reached over the terraces to the placement points.
Work was scheduled from 5 p.m., with the terraces open. In a public space, with people around, the safety zone and the path of the load count as much as the lift itself.
The job took two hours.
Have a project with special requirements?
We help you choose the right equipment and approach.