At Mihail Kogălniceanu we worked on the assembly of an asphalt plant. We were on site several times over a few weeks, on separate contracts for the same client.
The heavy work fell to the 90-tonne Liebherr LTM 1090-4.1, set up beside the plant with its telescopic boom raised above the top level of the structure. A smaller mobile crane worked alongside it, and at the end a truck-mounted crane set three containers down next to the plant.
The plant has several levels, with platforms and equipment at the top. At that height, boom length and working radius matter more than maximum capacity.
Estimated duration of the job: more than a month.
Have a project with special requirements?
We help you choose the right equipment and approach.