House demolition in Constanța: permits and estimated cost

Estimate your budget and rubble volume, then check the paperwork you need.

The new Code under Law 169/2026 applies from 25 August 2026. Check applications already in progress with your designer. Official source

House demolition calculator

Storeys, including ground floor
Main structural material
Basement under the full footprint
Remove foundations
Transport access
Estimated cost, RON
12,000 – 27,000
Rubble, m³
56 – 84
Tipper loads
6 – 9

Indicative house demolition cost based on market prices. Excludes taxes and fees and is not a Kran quote. The exact price is set after a site visit.

Required paperwork in 7 steps

  1. Request the urban planning certificate for demolition

    Submit the application and plans required by the city hall. The certificate does not authorise demolition. Official details

  2. Prepare the design and obtain approvals

    Your designer prepares the documentation and approvals required by the urban planning certificate. Official details

  3. Obtain the demolition permit

    Submit the application file and proof of fee payment to Constanța City Hall. Official details

  4. Notify the start of work and prepare the site

    Notify the authorities and arrange utility disconnections, protection measures and access. Official details

  5. Carry out demolition according to the design

    The contractor follows the design and permit conditions. Official details

  6. Separate and hand over waste

    Prepare the waste management plan, hand waste to authorised operators and keep the documents. Official details

  7. Update the land register and tax records

    Request removal of the building from OCPI records and separately declare the demolition to SPIT Constanța. Official details

How we calculate

Above-ground cost = footprint × storeys × 120 – 270 RON/m², a public benchmark from Daibau, section 7, not a Kran rate; VAT and the inclusion of transport or disposal are confirmed in the quote.

Volume = footprint × storeys × structural coefficient, plus footprint × selected additions. Assumptions, not measurements:

Volume coefficients
Componentm³/m²
Wattle and daub / timber, above-ground floor area0.35
Brick, above-ground floor area0.7
Reinforced concrete, above-ground floor area1
Basement, building footprint0.4
Foundations, building footprint, separate from basement0.25

Volume range: 0.8 – 1.2 × volume, rounded outwards to whole m³. Loads: volume / 10 or 5 m³, rounded up; legal payload, rubble weight and access may increase the actual number.

Material, basement and foundations affect volume; access affects the number of loads. The price excludes paperwork, design, expert assessments, disconnections, basement, foundations, special protection, difficult access and asbestos; transport and waste treatment are confirmed separately if not included in the estimate.

Need to demolish a house in Constanța?

Send the address and a few photos for a quote after a site visit.

Mechanical demolitionTipper transport